Xcel Energy - Brighton, CO

Natural Gas Processing Plant
Yosemite Gas Quality Station

Project Time Frame: June - October 2002
Project Turnkey Cost: $650,000
Building & Insulation Lefever Building Systems
Prefabricated Building System

Scope: Supply & Erect pre-engineered metal buildings.

Facilities: Project included five pre-engineered metal buildings, forming the core facilities for a new gas processing facility. Separate buildings were constructed for: Compressor, Metering, Electrical equipment, Gen-Set and Shop facilities. Building size varied from 60' x 212' x 24' to 25' x 50 x 12'.

Steel Buildings

Key Building Features