Eckstine Electric Warehouse Expansion

Platteville, Colorado

Project Time Frame: July - November 2002
Concrete & Building, Supply & Erection: Lefever Building Systems
Prefabricated Building System

Scope: Design-Build project, including the concrete work and design, supply, erection of the metal building. Self performed concrete work and Steel Erection.

Facilities: Project included 7,500 square feet of warehouse & shop space. Eave height 16 feet. End wall expansion to an existing facility.

Key Building Features