

| General Contractor: | Taylor Ball; Boulder Colorado |
|---|---|
| Project Turnkey Cost: | $13.6 million |
| Architect: | Edge Architecture, Inc.; Boulder, Colorado |
| Pre-Engineered Metal Building: | VP Buildings |
| Project Time Frame: | July 2000 - June 2001 |
| Supply & Erection | Lefever Building Systems |
Lefever Building Systems • 3975 E. 56th Avenue, Unit A-9 • Commerce City, Colorado 80022 • ph 303-297-3494
Copyright © 2009 Lefever Building Systems