

| Project Time Frame: | February 2007 – August 2007 |
|---|---|
| General Contractor: | Weaver General Construction |
| Building & Insulation: | Lefever Building Systems |
| Concrete Work: | Lefever Building Systems |
| Pre-Engineered Metal Building: | Varco Pruden |
| Hangar Doors: | Door Engineering |
| Project Turnkey Cost: | $693,533.00 |


Project Overview: New hangar for Mountain Aviation
Key Building Features: 175'x 110' hangar with offices, front office area was done by others and is structural steel with stucco walls.
Details on Steel Buildings from VP Buildings:
Roof Panels: 24 gauge, Standing seam roof panels, Egyptian White Wall Panels: 26 gauge, Panel rib walls, Ash Gray
Lefever Building Systems • 3975 E. 56th Avenue, Unit A-9 • Commerce City, Colorado 80022 • ph 303-297-3494
Copyright © 2009 Lefever Building Systems