City of Westminster

Westminster, CO

Project Location:13150 N. Huron Street; Westminster, Colorado 80234
Engineer:J-T Consulting
Pre-Engineered Metal Building:VP Buildings
Supply & Erection:Lefever Building Systems
Project Time Frame:October 2008 – December 2008
Project Metal Building Subcontract Value:$192,563

 

Project Overview:
70' wide x 100' long x 20' high building with a 70' wide x 40' long shop area in the front of the building and a 70' wide x 60' long x 20' high Salt Storage. Gabled roof slope of 1:12 with gutters and downspouts. All primary framing was supplied with "Hot Dipped" galvanized zinc coating. All roof purlins and wall girts were supplied as cold formed G-30 galvanized coated.

Details on Steel Buildings:
Roof Panels: 26 ga Panel Rib; Color; Terra Cotta
Wall Panels: 24 ga. Stucco Finished Texture Clad Panels; Color: Doeskin
Insulation: Roof and walls in the Shop Building were insulated with a 4" (R-13) reinforced vinyl faced insulation using a WMP-VRfacing. The salt storage area was uninsulated.

Other:
1 each 3070 man door for access into the Salt Storage Building along with 1 each 16' x 16' overhead door
2 each 3070 man doors for access into the Shop Building along with 5 each 12' x 14' overhead doors
2 each roof curbs for roof exhaust fans were supplied and installed for ventilation